U values 0.12W/m2K
The house was made in 2008 -2009 using Insulated concrete Neopor formwork (Isorast 37cm elements – 22cm Neopor insulation + 15cm reinforce concrete).
In the building and design process we follow the main PassivHaus principles:
* Thermal envelope
*Thermal bridge free
*South facing for solar gains